公司動態

聯系我們

conww.jpg

公司: 山東綿邈園林景觀工程有限公司

聯系人:于經理

手 機: 18354188859

地址:山東省濟南市高新區天辰路979號辦公樓1-101

公司動態

您的當前位置: 首頁>新聞動態>公司動態>山東景觀雕塑安裝需要注意的事項

山東景觀雕塑安裝需要注意的事項

發布日期: 2020-07-28 來源:http://www.nakagawakousan.com 點擊: 發布人:mianmao

當景觀雕塑安裝在環境中,整個景觀雕塑工程才算完成。好的景觀雕塑作品需要好的工程質量才能完美呈現。安裝階段作為景觀雕塑設計系統工程的一個子系統,對作品的成敗也起著關鍵性的作用。那么景觀雕塑安裝的時候需要注意的事項有哪些呢?下面由山東景觀雕塑的小編為大家介紹:

When the landscape sculpture is installed in the environment, the whole landscape sculpture project is completed. Good landscape sculpture works need good engineering quality to present perfectly. As a subsystem of landscape sculpture design system engineering, the installation stage also plays a key role in the success or failure of the works. So what should be paid attention to when installing landscape sculpture? The following is a brief introduction of Shandong landscape sculpture:
(1)施工人員管理
(1) Construction personnel management
首先,召開施工人員會議,擬出施工計劃,明確施工目標和分工任務;其次,找出施工難點,通過各方面人員討論,針對性地采取措施;再次,建立責任制度,提高施工人員的責任心,培養施工人員的敬業精神與細致的工作作風,以便減少施工問題的出現。
Firstly, the construction personnel meeting is held to draw up the construction plan and clarify the construction objectives and tasks; secondly, find out the construction difficulties and take targeted measures through the discussion of various personnel; thirdly, establish the responsibility system to improve the sense of responsibility of the construction personnel, cultivate the professionalism and meticulous work style of the construction personnel, so as to reduce the occurrence of construction problems.
(2)施工技術管理
(2) Construction technology management
在景觀雕塑安裝過程中,雕塑的內部結構是雕塑安裝過程的核心。由于雕塑施工行業暫未正規化,很多雕塑在搭建內部結構的時候依靠經驗行事,在后期出現了雕塑倒塌、無法接合等嚴重的問題,造成很大的資源浪費和損失。為盡量減少技術錯誤而帶來不必要的損失,
In the process of landscape sculpture installation, the internal structure of sculpture is the core of sculpture installation process. Due to the lack of standardization of sculpture construction industry, many sculptures rely on experience to build their internal structures. In the later stage, serious problems such as collapse of sculptures and failure to join occurred, resulting in great waste and loss of resources. In order to minimize unnecessary losses caused by technical errors,
首先,繪制詳細的設計圖紙,施工人員再根據圖紙進行準確、嚴密的施工,地減少誤差;其次,在施工現場,雕塑家應對施工人員進行嚴格的技術交底工作,認真落實每一個工序步驟,讓施工人員充分理解設計意圖,從而減少技術錯誤的發生機率,保證成本的控制;
First of all, the detailed design drawings are drawn, and then the construction personnel carry out accurate and strict construction according to the drawings, so as to minimize the error; Secondly, in the construction site, the sculptor should carry out strict technical disclosure to the construction personnel, seriously implement each process step, so that the construction personnel can fully understand the design intent, so as to reduce the probability of technical errors and ensure the cost control;
再次,雕塑家應進行施工現場監督,以便及時發現問題并及時糾正,才能保證質量和進度上的控制。通過以上途徑對安裝施工過程進行合理地分工協作管理,盡量減少施工問題出現的機率,以確保工程的順利完成,盡可能的達到質量好、效率高、低消耗的景觀雕塑建設目標。
Thirdly, the sculptor should supervise the construction site in order to find and correct the problems in time, so as to ensure the quality and progress control. Through the above ways, reasonable division of labor and collaborative management of the installation and construction process is carried out to minimize the probability of construction problems, so as to ensure the smooth completion of the project and achieve the goal of landscape sculpture construction with good quality, high efficiency and low consumption as far as possible.
景觀雕塑設計作為公共藝術事業的一個重要部分,其本身是一個復雜的系統。有一個清晰的、符合邏輯的系統思維來指導景觀雕塑設計是非常必要的
As an important part of public art, landscape sculpture design itself is a complex system. It is necessary to have a clear and logical system thinking to guide the landscape sculpture design

在線客服
分享
免费a片在线观看_欧美丰满熟妇xxxx性ppx_中文字幕无码日韩欧毛_国产精品综合av一区二区_国产欧美日韩一区二区搜索